Full RAS setup, optimal for fist-feeding/weaning period. Scalable and adjustable.

Supports system follows

Description

The technology has been successfully tested over the past five years. The initial system was implemented in a large post-smolt facility in Norway, where it has been producing Atlantic salmon fry for the past two years.

The system operates at a salinity level of 0.5‰ and a temperature range of 12–14 °C, achieving a 98% water recycling rate.

Biofiltration is fully integrated into the SCADA system for automated control, with backwashing scheduled every four weeks.

Parameter
First feeding
Temperature (°C)
12-14
Salinity (‰)
0,5
Number of tanks (pc.)
2
Fish tank diameter (ø, m)
3,40
Water level (m)
1,30
Fish tank height (m)
1,80
Fish tank volume (m³)
12
Total fish tank volume (m³)
24
Water flow per fish tank (m³/h)
24
Total water flow per fish tank (m³/h)
49
Water exchange in tanks (times/h)
2,0
Retention time in tanks (min.)
30
Biomass (kg)
468
Fish weight – start (g/pc.)
0,2
Fish weight – end (g/pc.)
5
Density MAX (kg/m³)
20
Biofilter capacity (kg/day)
23

Would you like to know more about our Fry / First feeding concept?