Description
Partial reuse systems enable rapid installation in under one year, significantly reducing CapEx and accelerating ROI for salmon smolt production.
Proven for stable water quality, lower infrastructure costs, and flexible siting, ideal for land-based salmon farms.
Infrastructure stays simple no complex full-RAS biofilters or degassers required, our pre-assembled PE equipment enables faster, easier on-site installation.
Parameter | Smolt Hybrid |
|---|---|
Temperature (°C) | 6-9 |
Salinity (‰) | 0-34 |
Number of tanks (pc.) | 2 |
Fish tank diameter (ø, m) | 21,6 |
Water level (m) | 6,7 |
Fish tank height (m) | 9,8 |
Fish tank volume (m3) | 2.500 |
Total fish tank volume (m3) | 5.000 |
Water flow per fish tank (m3/h) | 2.500 |
Total water flow per fish tank
(m3/h) | 5.000 |
Water exchange in tanks (times/h) | 1 |
Retention time in tanks (min.) | 60 |
Biomass MAX (kg) | 250.000 |
Fish weight – start (g/pc.) | 250 |
Fish weight – end (g/pc.) | 1.100 |
Density MAX (kg/m3) | 50 |
Biofilter capacity (kg/day) | 3.750 |
Daily water exchange (m3/day) | 48.000 |
Feed Rate (theoretical, %) | 1,5 |