The final design of the project is determined based on the requirements established during the concept phase. RAS descriptions, drawings, and solutions are developed and reviewed, with any necessary revisions and expansions made to ensure that all details and specifications necessary for construction are included.
The design and documentation of all RAS requirements is completed:
– System descriptions:
– Electrical & mechanical
– Water hydraulics (head loss)
– Control & monitoring
– Drawing package:
– BIM modelling (LOD 400)
– Excavation drawings
– Concrete drawings
– Production drawings
– Installation drawings
– Production plan overview
– Final energy consumption report
– Equipment & material lists
– Responsibility Assignment Matrix (RACI)
– P&ID (Piping/Process & Instrumentation Diagram)