Lerøy Midt, Norway

Client

Lerøy

Year

2024

Capacity

Unchanged

Category

EC upgrade

Share project

In order to optimize production, we have been implementing an EC upgrade with the delivery of a chiller equipped with an exchanger for precise temperature regulation. This upgrade seamlessly integrates into the existing Recirculating Aquaculture System (RAS) facility, enhancing its efficiency and performance.